Konstancin-Jeziorna
Measures implemented last year:
- replacement of the luminaires in some circulation paths and in a part of the KDM room with LED luminaires,
- continuous training and optimisation of the way electrical and sanitary installations are controlled from the BMS.
Measures planned for the following years:
- replacement of UPS devices with modern energy-saving ones (the design is in place, we are finalising the tender to select the contractor),
- continued successive replacement of luminaires,
- replacement of 5 condensing units (with two refrigeration circuits/each) serving the air handling unit coolers of the KDM (design is in place, a tender to select the contractor is being prepared).
ZKO Bydgoszcz:
Measures implemented last year:
- modernisation of office lighting by replacing fluorescent luminaires with LED luminaires,
- modernisation of the central heating substation including expansion of central heating substation control automation and replacement of valves with control fittings.
Measures planned for the following years:
- modernisation of the central heating system in the administration building and garage premises,
- replacement of fluorescent lighting with LEDs – multi-storey outdoor car park,
- modernisation of the supply system, including UPS devices.
ZKO Poznań:
Measures implemented last year:
- replacement of internal lighting in offices and corridors from fluorescent to LED luminaires,
- replacement of external lighting luminaires from sodium vapour to LED.
Measures planned for the following years:
- comprehensive thermomodernisation of the Main Building is planned for the forthcoming period (2023),
- modernisation of the supply system, including UPS devices,
- continued successive replacement of luminaires.
ZKO Katowice
Measures implemented last year:
- replacement of LED lighting in buildings B1, B2, B4, B5,
- renovation of the moat and water pipes between building B1 and B2.
Measures planned for the following years:
- modernisation of the supply system, including UPS devices.
ZKO Radom
Measures implemented last year:
- replacement of LED lighting in corridors on floors III, IV, V in the BUT building,
- installation of compensation systems in BG and BUT.
Measures planned for the following years:
- construction of new modern premises with an eye to maintaining high energy efficiency,
- continued successive replacement of luminaires.
All of these measures are successively contributing to improving the energy efficiency of PSE head offices.